star First SWMS free · no card
A SWMS written for your job. In your inbox in minutes.
Describe the work the way you'd tell your crew. You get a Word document built from a consultant-reviewed control library and your state's WHS law, ready for you to check and sign off as the PCBU.
Start my free SWMS arrow_forward- About 5 minutes
- Editable Word file
- Every state and territory
- 3 revisions included
person You, from the ute
Switchboard upgrade at 14 Marine Pde, Cronulla. Replace the old main switchboard in the ground-floor plant room and core drill 2 × 50 mm holes through the slab for new conduits. Building is occupied. Supply isolated at the pillar, locked and tagged. Three sparkies, two days.
- Site set-up, induction, exclusion zone at the plant room
- Isolate at the pillar, lock-out, test for dead — licensed electrician
- Core drill slab — wet method, P2 respirator, dust extraction
- Remove old MSB, install and terminate new MSB
A complete SWMS, not a form to fill in
Every document follows the structure principal contractors' safety teams expect, so it reads like a consultant wrote it — because the rules behind it were.
- verifiedFront page with PCBU, site, supervisor, scope and review date
- verifiedHigh-risk construction work checklist, ticked for the work being done
- verifiedPPE, plant, permits, licences and hazardous substances for this job
- verifiedYour state's Act, Regulations, Codes of Practice and Standards
- verified5×5 risk matrix and hierarchy of controls
- verifiedActivities in sequence — hazards, controls, residual risk, responsibility
- verifiedEmergency response with the nearest emergency department
- verifiedConsultation and sign-on sheet, approval and revision history




Three steps. About five minutes.
Describe the job
Address, trade and the work in plain English. Drop in the quote or plans if you have them, or answer five quick taps and the platform drafts it for you.
It gets written
Steps in order, hazards, controls in hierarchy order, your state's legislation — then 25+ quality checks before it's issued.
Check, sign, send
It lands in your inbox as a Word file. Check it against the site, consult your crew, send it to the builder. Three revisions included.
Template, consultant, or Site Specific SWMS
| Feature | Downloaded template | Consultant-written | Site Specific SWMS |
|---|---|---|---|
| Specific to your site, scope and HRCW | Only if you rewrite it | Yes | Yes — written from your description |
| Turnaround | Hours of your time | Typically several business days | About 5 minutes |
| Cost | Free to a few hundred dollars, plus your time | Typically several hundred dollars per SWMS* | First free, then $19.99 inc. GST |
| Legislation matched to your state | Rarely | Yes | Yes — 8 jurisdiction packs |
| Controls in hierarchy order, per activity | Rarely | Yes | Yes — checked on every high-risk activity |
| Revisions when the job changes | Do it yourself | Usually charged | 3 included |
| Editable Word document | Usually | Often PDF only | Yes |
| Reviewed and issued by you as the PCBU | Required | Required | Required — and built in |
* Indicative market ranges for an individual consultant-prepared SWMS in Australia; they vary by trade, scope and consultant. A consultant is still the right choice for complex, multi-stage or engineered works — iHSEQ does that work too.
No subscription. No lock-in. First one free.
Try it on a real job first. Pay per SWMS only after that.
FREE
Your first SWMS
- checkFull site-specific SWMS, built in minutes
- check25+ quality checks
- checkWord file emailed and saved to your account
- checkUp to 3 revisions
$19.99 inc. GST
Every SWMS after that
- checkSame document, same checks, 3 revisions
- checkTax invoice emailed with every payment
- checkSecure card payment by Stripe
- checkPay per SWMS — no subscription
Not right? Three revisions are included, and if you still aren't satisfied, email [email protected] and we will help you with the platform.
Built by the consultants who write SWMS for a living
Site Specific SWMS is built and maintained by iHSEQ Pty Ltd, a specialist HSEQ consultancy in Kogarah, NSW. The control library, legislation packs and quality checks are the ones we use in our own consulting work on construction and electrical sites.
- location_onWritten for your project. Your address, trade, scope and the high-risk work involved. Two jobs for the same trade get different documents.
- verifiedApproved control library. Controls written in hierarchy order, with PPE never the only answer to a high risk.
- menu_bookLegislation for your state. The WHS or OHS Act, Regulations, Codes and Standards for your state or territory.
- fact_checkChecked before it is issued. 25+ quality checks on every SWMS. Anything that could not be resolved is printed as an item for you to confirm, not hidden.
- smartphonePlain English, on your phone. Describe the job from the ute. The document your crew signs is written in language they will read.
Tarek Farhat
Principal Consultant, iHSEQ Pty Ltd
- workspace_premiumExemplar Global certified Lead Auditor — ISO 9001, ISO 14001 and ISO 45001
- engineeringYears on construction and electrical sites as a safety advisor and operations manager before consulting
- gavelWrites SWMS, WHS management plans and ISO systems for builders and subcontractors every week
No consultant reviews your individual SWMS on the platform — the rules, library and checks they wrote do. You review and issue it as the PCBU. ihseq.com.au
Builders: stop chasing subbies for SWMS
Point your subcontractors here. Every document arrives in the same structure — HRCW ticked, legislation referenced, controls in hierarchy order, sign-on sheet attached — so your safety team reviews faster and starts fewer back-and-forths. Their first one is free.
A note you can send your subbies
Please prepare your SWMS for this site at sitespecificswms.com.au — your first one is free, it comes as a Word file with the HRCW checklist ticked and a sign-on sheet attached.
SWMS for the work you actually do
Each SWMS is written for your project, trade, address and high-risk construction work. Pick your trade to see what it covers.
SWMS by high-risk construction work
SWMS guides · NSW · QLD · VIC · WA · SA, ACT, TAS, NT
Built in Sydney for Australian sites and Australian WHS law
It isn't an overseas template site with Australian words swapped in — the legislation packs, Codes of Practice and control library are written for how work is actually done here.
- flagAustralian owned and operated
iHSEQ Pty Ltd · ABN 71 648 495 470 · Kogarah NSW - dnsStored in Australia
Documents, uploads and account data are stored in Sydney data centres. AI writing is processed by Anthropic (USA) and is not used to train its models. - gavelAustralian WHS legislation
Model WHS Act and Regulations, Victoria's OHS framework, Codes of Practice and AS/NZS Standards - mapEvery state and territory
NSW, QLD, VIC, SA, WA, TAS, ACT and NT each have their own legislation pack
Email me a sample SWMS
A complete 14-page example — switchboard upgrade in an occupied building, with scissor-lift cable tray work and core-drilled penetrations — as a Word document. Open it, check the layout against what your builder asks for, then build your own for free.
Questions, answered
About five minutes from the time you submit. The platform plans the method, writes every activity, runs its quality checks and emails you the Word document. You check it, amend anything that doesn’t match the site, and send it to your client.
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. Your first SWMS is free — no credit card required.
Start my free SWMS arrow_forward