SWMS guides for Australian sites

Plain-English guides to Safe Work Method Statements: what they are, when you need one, how to write one, and what each state requires.

Guides

What is a SWMS?

What is a SWMS? A plain-English guide to Safe Work Method Statements: when the law requires one, who prepares it, what it must contain and how long to keep it.

How to write a SWMS builders will accept

How to write a SWMS a builder will accept: identify the HRCW, break the job into steps, set controls in the right order, consult the crew and keep it current.

High risk construction work (HRCW): the full list

High risk construction work explained: all 18 HRCW categories in plain English, the 19 used in Victoria, and why each one means a SWMS before you start.

SWMS vs JSA: which one do you need?

SWMS vs JSA, JHA, risk assessment and safe work procedure: what each document is, which one the law requires, and when builders will ask you for each on site.

SWMS checklist for principal contractors

SWMS checklist for principal contractors: the site details, HRCW, controls, isolation, emergency, sign-on and licence items to check before work starts.

SWMS for silica dust and engineered stone

Silica dust SWMS guide: the exposure standard, the engineered stone ban, water and on-tool extraction, RPE fit testing and health monitoring.

SWMS for elevating work platforms (EWPs)

EWP SWMS guide: scissor lifts vs boom lifts, the WP licence for booms 11 m or more, when EWP work is high risk construction work, and the controls a SWMS needs.

Who prepares, signs and keeps a SWMS?

Who prepares, signs and keeps a SWMS: the PCBU duty, worker consultation, principal contractor obligations, sign-on, review triggers and how long to keep it.

SWMS for scaffolding work

Scaffolding SWMS guide: when scaffold work is high risk construction work, the 4 metre licence rule, handover and 30-day inspections, and controls to include.

SWMS requirements by state

SWMS by trade and task

See the trade and task pages, or how the SWMS generator works.