SWMS for HVAC / Air Conditioning

HVAC SWMS for units, ductwork, refrigerant and ceiling work.

Air conditioning installs combine electrical connection, refrigerant lines, crane lifts of condensers, ceiling-space work and plant rooms that can be confined spaces. The SWMS has to cover each in sequence, with the licensed work identified. Describe the job and the platform writes it.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 11 Work on or near energised electrical installations
  • 1 Risk of a fall more than 2 m
  • 10 Work on or near chemical, fuel or refrigerant lines
  • 6 Work in or near a confined space
  • 15 Movement of powered mobile plant

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Site arrival, induction and plant-room or roof access check
  2. Crane or hoist lift of condensers and air-handling units
  3. Ductwork and pipework installation in ceiling spaces
  4. Refrigerant pipework, brazing and pressure testing
  5. Electrical isolation, connection and testing
  6. Commissioning and balancing
  7. Clean-up and handover

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Electric shock during connection and testing

Isolation and test for dead, licensed electrician, no live work

Falls in ceiling spaces and from roofs

Ceiling-space walkways or platforms, edge protection on roofs, EWP where ceilings are high

Refrigerant release and brazing

Licensed refrigerant handling, recovery before opening lines, hot-work permit and fire watch for brazing

Crane lifts of heavy units

Lift plan, exclusion zone, dogman, taglines and no one under the load

Who asks for it

Set out the way builders' safety teams expect

Builders, mechanical contractors and facility managers require it before lifts or roof work; licensed refrigerant and electrical work must be identified in it.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a hvac / air conditioning SWMS

Does it separate licensed work?

Yes. Electrical connection and refrigerant handling are written as their own activities with the licence requirements stated, so the builder can see who does what.

Is the crane lift in the SWMS?

The lift of the units is an activity with the lift plan, exclusion zone and communication method. The crane contractor’s own SWMS and lift study sit alongside it.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Electrical SWMS · Plumbing SWMS · Roofing SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free hvac / air conditioning SWMS arrow_forward