SWMS for Trenching

Trenching SWMS for ground support, services and plant at the edge.

A trench or shaft deeper than 1.5 metres is high-risk construction work. For any trench at least 1.5 metres deep, the WHS Regulations require all sides to be adequately supported by shoring, benching or battering, unless a geotechnical engineer has advised in writing that all sides are safe from collapse. The SWMS also has to deal with services, spoil, access and plant near the edge. Describe the trench and the platform writes it.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 7 Trench or shaft deeper than 1.5 m, or a tunnel
  • 15 Movement of powered mobile plant
  • 11 Work on or near energised electrical installations
  • 9 Work on or near pressurised gas mains or piping

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Before You Dig Australia enquiry, plans and electronic service location
  2. Site set-up, barriers, exclusion zones and traffic management where needed
  3. Pot-hole by hand or vacuum to expose services before mechanical digging
  4. Excavate with benching, battering or shoring to suit the ground and depth
  5. Place spoil back from the edge and set up ladder access
  6. Work in the trench — pipe laying, conduit or footings — with daily inspection of the ground support
  7. Backfill, compact, remove shoring progressively and reinstate

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Trench wall collapse and engulfment

Benching, battering or shoring for trenches 1.5 m or deeper, designed for the ground conditions; no entry to an unsupported trench; inspection after rain and each shift

Striking underground power, gas or water

Before You Dig plans, electronic location, pot-holing before mechanical excavation, permit from the asset owner where required

Plant and spoil surcharging the edge

Spoil and stockpiles kept back from the edge, plant exclusion zone at the edge, wheel stops or barriers

Falls into the trench and trapped workers

Barriers or covers around open trenches, ladder access within the trench, never work alone in a trench, rescue arrangements

Who asks for it

Set out the way builders' safety teams expect

Civil contractors, builders, councils and utilities require it before a trench is opened, and the asset owner may ask for it before work near their services.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a trenching SWMS

What depth of trench needs a SWMS?

A trench or shaft deeper than 1.5 metres is high-risk construction work. Shallower trenches still need a SWMS if another category applies, such as work near energised cables or pressurised gas mains, and collapse risk still has to be managed.

Is shoring always required?

For trenches at least 1.5 metres deep, the Regulations require all sides to be adequately supported by shoring, benching or battering, unless a geotechnical engineer advises in writing that all sides of the trench are safe from collapse. Shallower trenches still need their collapse risk managed. The SWMS names the method used.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Excavation SWMS · Plumbing SWMS · Civil Works SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free trenching SWMS arrow_forward