SWMS for Traffic control
SWMS for work on or near a road in use.
Work on or near a road, rail or traffic corridor in use is high-risk construction work. Your SWMS needs to sit alongside a traffic guidance scheme prepared by someone with the right accreditation, and set out how the work zone is set up, staffed and removed. Describe the works and the road and the platform writes it.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 14 Work on or near a road, rail or traffic corridor in use
- 15 Movement of powered mobile plant
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Obtain road occupancy approval from the road authority or council where required
- Review the traffic guidance scheme or traffic management plan prepared by an accredited person
- Pre-start brief, high-visibility clothing and equipment check
- Install signs and devices in the order shown on the scheme
- Carry out the works inside the protected work zone, with accredited traffic controllers where used
- Night works: lighting, night-rated high-vis and extra delineation
- Remove signs and devices in reverse order and reopen the road
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Workers struck by passing traffic
Close the lane or road where practicable; otherwise barriers, buffer zones, speed reduction and workers facing traffic; no work outside the protected zone
Errors setting up and removing the work zone
Install and remove devices in the order on the scheme, from a protected vehicle where required, by trained workers
Site plant interacting with workers and traffic
Plant movements within the work zone only, spotters, controlled entry and exit points
Poor visibility at night and in bad weather
Lighting to the scheme, high-vis clothing rated for night use, extra delineation, stop-work in poor conditions
Who asks for it
Set out the way builders' safety teams expect
Councils, road authorities, utilities and principal contractors require it for road, footpath and kerbside works, usually with the traffic guidance scheme attached.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a traffic control SWMS
Who can prepare a traffic guidance scheme?
Each state road authority sets the accreditation needed to design and implement traffic management, generally based on the Austroads Guide to Temporary Traffic Management. The SWMS references the scheme; it does not replace it.
Is footpath work on or near a road?
Often, yes. Works on a footpath or verge next to a road in use can expose workers to traffic, and the SWMS should treat it as HRCW category 14 where that risk exists.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Civil Works SWMS · Mobile plant SWMS · Excavation SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free traffic control SWMS arrow_forward