SWMS for Glazing
Glazing SWMS for glass handling, vacuum lifters and heights.
Glass is heavy, sharp and can fail without warning. Glazing work adds stillages and A-frames, vacuum lifters, cranes and EWPs, and installation at height on facades and balconies. The SWMS has to cover how each pane is moved from the truck to the opening. Describe the job and the platform writes it.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 1 Risk of a fall more than 2 m
- 15 Movement of powered mobile plant
- 14 Work on or near a road, rail or traffic corridor in use
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Site arrival, induction and delivery planning, including traffic control if unloading from the road
- Unloading and storing glass on secured stillages or A-frames
- Inspection and testing of vacuum lifters before use
- Moving glass to the opening by hand, trolley, vacuum lifter, crane or EWP
- Installing and fixing panes, with edge protection or EWP at height
- Sealing, glazing beads and cleaning
- Removing broken glass and waste, demobilisation
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Glass packs toppling from stillages or A-frames
Stillages on firm level ground, glass restrained at all times, unload in the correct sequence, exclusion zone around stored glass
Vacuum lifter failure and dropped panes
Lifter rated for the load, pre-use inspection and battery check, clean dry glass surface, exclusion zone below, no one under the load
Falls at openings, balconies and facades
Edge protection or scaffold at openings, EWP with harness for facade work, no leaning out through openings
Cuts from glass edges and breakage
Cut-resistant gloves and sleeves, eye protection, edge protection on panes, broken glass handled and disposed of safely
Who asks for it
Set out the way builders' safety teams expect
Builders, facade contractors, shopfitters and strata managers ask for it before glass is delivered, and crane lifts usually need a lift plan alongside it.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a glazing SWMS
Is glazing high-risk construction work?
Often. Installation at height with a risk of a fall of more than 2 metres, crane or EWP use with powered mobile plant moving, and unloading from a road in use are all HRCW categories. Ground-floor shopfront work may not be, but the risks still need managing.
Are crane lifts covered?
The lift is written as an activity with the lift plan, exclusion zone, dogman and taglines. The crane contractor’s own SWMS and lift study sit alongside it.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Working at heights SWMS · Mobile plant SWMS · Carpentry SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free glazing SWMS arrow_forward