SWMS for Asbestos disturbance
SWMS for work that is likely to disturb asbestos.
Drilling, cutting or stripping out in an older building can disturb asbestos, and that is high-risk construction work. This SWMS covers checking for asbestos first, working around known material, and stopping if you find something suspect. It does not cover removal: asbestos removal is licensed work done under the removalist’s asbestos removal control plan, and this platform does not write removal SWMS.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 4 Likely disturbance of asbestos
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Before starting, review the asbestos register or survey, or arrange an inspection for homes
- Mark known or presumed asbestos-containing material (ACM) and plan the work around it
- Brief the crew on what ACM looks like and the stop-work procedure
- Carry out the work with hand tools near ACM — no power tools, compressed air or high-pressure water on it
- Unexpected find: stop, isolate the area, keep people out, notify the PCBU
- Licensed removalist engaged where removal is needed; work resumes only after clearance
- Clean up with wet wiping and an H-class vacuum; no dry sweeping
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Disturbing hidden asbestos during drilling, cutting or demolition
Register, survey or sampling before work; ACM labelled and avoided; work redesigned to leave ACM undisturbed
Unexpected suspect material found mid-job
Stop work immediately, isolate and sign the area, notify the PCBU, sample by a competent person, no work until confirmed
Asbestos fibres released by tools or cleaning
Hand tools only near ACM, wet methods, H-class vacuum, no compressed air, no dry sweeping or high-pressure water
Contaminated clothing, tools and waste
Disposable coveralls and P2 respirator as a minimum where exposure is possible; tools decontaminated; waste bagged, labelled and disposed of at a licensed facility
Who asks for it
Set out the way builders' safety teams expect
Builders, strata and facility managers and schools ask for it before refurbishment, electrical, plumbing or fit-out work in buildings that may contain asbestos.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a asbestos disturbance SWMS
Does this SWMS cover asbestos removal?
No. Removal of friable asbestos, or more than 10 m² of non-friable asbestos, must be done by a licensed removalist working under their own asbestos removal control plan and SWMS. This platform does not write removal SWMS. Your SWMS covers identification, avoidance and stop-work.
How do I know if a building has asbestos?
A workplace in a building built before 31 December 2003 (31 December 1989 in Queensland) must have an asbestos register; newer buildings need one only if asbestos has been identified or is likely to be present. Buildings from before the late 1980s are the most likely to contain it. Before refurbishment or demolition, asbestos has to be identified so far as reasonably practicable, including in homes, usually by a competent person inspecting and sampling.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Demolition SWMS · Electrical SWMS · Plumbing SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free asbestos disturbance SWMS arrow_forward