SWMS for Mobile plant

Mobile plant SWMS for excavators, loaders, forklifts and EWPs.

Work carried out where there is movement of powered mobile plant is high-risk construction work. Most site deaths involving plant come from people being struck or crushed, so the SWMS has to separate people from plant and show who controls the movement. Describe the plant and the job and the platform writes it.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 15 Movement of powered mobile plant
  • 14 Work on or near a road, rail or traffic corridor in use
  • 11 Work on or near energised electrical installations

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Site arrival, induction and review of the traffic management plan
  2. Confirm operator licences, competency and plant documents
  3. Daily pre-start checks of the plant, recorded
  4. Set up exclusion zones, pedestrian routes and a spotter where needed
  5. Check overhead powerlines and underground services along the travel path
  6. Operate the plant with positive communication to the spotter and other workers
  7. Park, isolate and secure the plant at the end of the shift

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

People struck or crushed by moving plant

Separate pedestrians and plant with barriers and set routes; exclusion zones; spotter with agreed signals; reversing alarms and cameras

Plant rollover on slopes, soft ground or excavation edges

Ground assessment, set-back from edges, operation within the manufacturer’s limits, seatbelts and ROPS

Contact with overhead powerlines

Identify lines before work, keep to the state approach distances, isolation by the network operator or a spotter, tiger tails do not replace distance

Unlicensed or untrained operators

High risk work licence checked for plant that requires one (forklift, cranes, boom EWP 11 m and over); competency and verification for other plant

Who asks for it

Set out the way builders' safety teams expect

Principal contractors, civil contractors and plant hire companies ask for it, usually with the traffic management plan and plant documents attached.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a mobile plant SWMS

Which plant needs a high risk work licence?

Forklifts, order pickers, most cranes and hoists, and boom-type elevating work platforms with a boom length of 11 metres or more need a high risk work licence. Excavators, loaders and skid steers do not, but operators must be competent and the PCBU should verify it.

Do I need a traffic management plan as well?

Where plant and people share a site, a traffic management plan is the normal way to separate them. The SWMS references it and covers the task-level controls such as spotters and exclusion zones.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Excavation SWMS · Traffic control SWMS · Civil Works SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free mobile plant SWMS arrow_forward