SWMS for Scaffolding

Scaffolding SWMS for erection, alteration and dismantling.

Scaffolders work at the leading edge by definition. The SWMS has to set out the erection sequence, how the first lift is protected, ties and bracing, material handling, and the handover inspection before anyone else uses the scaffold. Describe the scaffold and the platform writes it.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 1 Risk of a fall more than 2 m
  • 15 Movement of powered mobile plant
  • 11 Work on or near energised electrical installations
  • 14 Work on or near a road, rail or traffic corridor in use

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Site arrival, induction and base assessment (ground bearing, sole boards)
  2. Material delivery, crane or loader lifts and manual handling
  3. Erecting the first lift with edge protection and advanced guardrails
  4. Progressive lifts, ties, bracing and access
  5. Alterations during the build
  6. Handover inspection, tagging and the scaffold register
  7. Dismantling in reverse sequence

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Falls during erection and dismantling

Advanced guardrail or edge protection before the lift is accessed, harness where required, ticketed scaffolders

Scaffold collapse

Design, ties and bracing to the drawings, base plates and sole boards, loads within the duty rating

Overhead powerlines

Clearance checks, tiger tails or isolation arranged with the network operator

Dropped components

Exclusion zone below, no throwing, components passed hand to hand or lowered

Who asks for it

Set out the way builders' safety teams expect

Principal contractors ask for it before the first lift goes up, and the scaffold handover certificate is expected alongside it.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a scaffolding SWMS

Does the scaffold still need a certificate?

Yes. The SWMS covers the method; the handover inspection and certificate by a competent person, and the scaffold register, are separate obligations and the SWMS references them.

Is work near powerlines covered?

Work near overhead powerlines is written as its own activity with the clearance distances, tiger tails or isolation arrangement and a spotter.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Roofing SWMS · Carpentry SWMS · Painting SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free scaffolding SWMS arrow_forward