SWMS for Demolition
Demolition SWMS for strip-outs, structural demolition and asbestos.
Demolition of a load-bearing element is high-risk construction work in itself. Add asbestos, services disconnection, temporary support, excavators and the public on the footpath, and the SWMS has to set out the sequence and the exclusion zones clearly. Describe the structure and the method and the platform writes it.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 3 Demolition of a load-bearing element
- 4 Likely disturbance of asbestos
- 5 Structural alterations needing temporary support
- 15 Movement of powered mobile plant
- 14 Work on or near a road, rail or traffic corridor in use
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Pre-demolition survey, asbestos register and hazardous materials check
- Disconnection and capping of electrical, gas, water and communications
- Site security, hoarding and exclusion zones
- Soft strip-out and salvage
- Temporary support of elements to be retained
- Structural demolition in the engineered sequence
- Waste segregation, loading and transport
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Uncontrolled collapse
Engineered demolition sequence, temporary support, exclusion zones and a competent person directing each stage
Asbestos and hazardous materials
Register and survey before work; licensed removal and clearance before demolition proceeds
Struck by plant and falling debris
Exclusion zones, spotters, drop zones and overhead protection
Public and adjoining properties
Hoarding, signage, traffic control where the footpath or road is affected, dust and noise controls
Who asks for it
Set out the way builders' safety teams expect
Councils, principal contractors and demolition licence conditions all require a SWMS; many clients also want it before they engage you.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a demolition SWMS
Does the platform replace a demolition work plan?
No. A demolition work plan and, where required, a licensed demolition contractor remain your obligations. The SWMS sets out how each activity is done safely and references the plan.
Can I attach the asbestos register?
Yes. Drop in the register, survey or plans when you describe the job and the SWMS is written around them.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Excavation SWMS · Civil Works SWMS · Scaffolding SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free demolition SWMS arrow_forward