SWMS for Excavation

Excavation SWMS for trenches, bulk earthworks and service strikes.

Trenches deeper than 1.5 m, underground power and gas, mobile plant working around people and the road outside the gate — excavation work is where several high-risk categories meet. Your SWMS has to show the ground support, the service location and the plant exclusion zones. Describe the job and the platform writes it.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 7 Trench or shaft deeper than 1.5 m, or a tunnel
  • 15 Movement of powered mobile plant
  • 14 Work on or near a road, rail or traffic corridor in use
  • 11 Work on or near energised electrical installations
  • 9 Work on or near pressurised gas mains or piping

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Before You Dig Australia enquiry, plans and electronic service location
  2. Site set-up, exclusion zones and traffic management
  3. Pot-holing by hand or vacuum to expose services
  4. Excavation with benching, battering or shoring to the ground conditions
  5. Spoil management and trench access
  6. Backfill and compaction
  7. Reinstatement and demobilisation

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Trench collapse

Geotechnical assessment, shoring or battering, spoil kept back from the edge outside the zone of influence, access ladders, daily inspection

Underground service strike

Plans, locating, pot-holing and a permit before mechanical excavation near services

Mobile plant and people

Exclusion zones, spotters, positive communication and no one in the swing radius

Traffic and the public

Traffic guidance scheme, barriers and signage where the works affect a road or footpath

Who asks for it

Set out the way builders' safety teams expect

Civil contractors, builders, utilities and councils require it before ground is broken; a service strike without one is also an insurance problem.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a excavation SWMS

Is a Before You Dig enquiry enough?

No. Plans show where services were recorded, not where they are. The SWMS includes electronic location and pot-holing before any mechanical excavation near a service.

Does it cover the excavator operator?

Yes. Operator competency, pre-start checks, exclusion zones and the spotter arrangement are written into the plant and activity sections.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Plumbing SWMS · Civil Works SWMS · Concreting SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free excavation SWMS arrow_forward