SWMS for Civil Works

Civil works SWMS for roads, drainage, kerbs and services.

Civil work is done around live traffic and heavy plant, with trenches, underground services and often water. Councils, utilities and principal contractors expect a SWMS that matches the traffic guidance scheme and the plant on site. Describe the works and the platform writes it, with the state’s traffic and excavation requirements referenced.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 14 Work on or near a road, rail or traffic corridor in use
  • 15 Movement of powered mobile plant
  • 7 Trench or shaft deeper than 1.5 m, or a tunnel
  • 17 Work in or near water with a drowning risk
  • 11 Work on or near energised electrical installations

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Site establishment, induction and traffic guidance scheme implementation
  2. Service location and pot-holing
  3. Excavation for drainage, kerb and pavement works
  4. Pipe and pit installation
  5. Compaction, base and pavement works
  6. Working near water, culverts and drains
  7. Reinstatement, line marking and demobilisation

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Live traffic

Traffic guidance scheme, accredited traffic controllers, barriers and speed reduction, workers facing traffic

Mobile plant and people

Exclusion zones, spotters, positive communication, plant pre-starts and reversing alarms

Trench collapse and service strikes

Ground support for trenches 1.5 m and deeper, service location and pot-holing before digging

Water and drowning risk

Weather monitoring, flotation and rescue equipment where there is a drowning risk, no entry to flowing water

Who asks for it

Set out the way builders' safety teams expect

Councils, road authorities, utilities and principal contractors require a civil SWMS, usually with the traffic guidance scheme and plant list attached.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a civil works SWMS

Does it reference the traffic guidance scheme?

Yes. Work on or near a road in use is HRCW category 14. The SWMS references your traffic guidance scheme and the controller arrangements rather than repeating the scheme.

Can it cover multiple work fronts?

Describe each work front and the platform writes the activities in sequence. If the fronts are very different, a SWMS per package is clearer for the principal contractor.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Excavation SWMS · Concreting SWMS · Demolition SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free civil works SWMS arrow_forward