SWMS for Solar Installation

Solar SWMS for roof access, DC isolation and panel handling.

Solar installs combine roof work above 2 metres, panels carried across the roof, DC wiring that is live whenever light hits the array, and heat. The builder or homeowner’s insurer will want to see how falls and electrical risks are controlled on this roof. Describe the job and the platform writes it.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 1 Risk of a fall more than 2 m
  • 11 Work on or near energised electrical installations
  • 4 Likely disturbance of asbestos
  • 15 Movement of powered mobile plant

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Site arrival, induction, roof inspection and asbestos check on older roofs
  2. Edge protection, scaffold or roof safety system installed
  3. Lifting panels and racking to the roof by hoist, EWP or crane
  4. Installing rails, mounts and panels
  5. DC wiring with panels covered or connectors left open
  6. Inverter, isolators and AC connection by a licensed electrician
  7. Testing, commissioning and handover

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Falls from the roof edge or through skylights and brittle roofs

Edge protection or scaffold before roof access, skylight covers, walkways on brittle sheeting, harness as a last resort with a rescue plan

Electric shock and arcing from DC strings

Treat arrays as live in daylight, cover panels or leave connectors open until ready, DC isolators off, never break a DC connection under load

Manual handling of panels on a pitched roof

Mechanical lifting to roof level, two-person carry, no carrying in strong wind, panels secured as placed

Heat stress and UV on metal roofs

Early starts, shade breaks, water, long sleeves and sun protection, stop-work for extreme heat

Who asks for it

Set out the way builders' safety teams expect

Builders, commercial clients, strata managers and some retailers ask for it before roof work, and accredited installers are expected to have one for each site.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a solar installation SWMS

Is solar installation high-risk construction work?

Usually. Work on a roof with a risk of a fall of more than 2 metres is HRCW, and work on or near energised electrical installations is too. A PV array produces voltage whenever it is in light, so it cannot be fully isolated during the day.

Does the SWMS cover the electrical connection?

Yes. AC connection and inverter work are written as a separate activity done by a licensed electrician, with isolation and test-for-dead steps. Installer accreditation (Solar Accreditation Australia, which replaced the Clean Energy Council scheme in February 2024) is listed so you can confirm it.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Electrical SWMS · Roofing SWMS · Working at heights SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free solar installation SWMS arrow_forward