SWMS for Energised electrical work
SWMS for work on or near energised electrical installations.
Work on or near energised electrical installations or services is high-risk construction work. The default is to de-energise: isolate, lock out, tag and test before you touch. Live work is only allowed in the limited circumstances the WHS Regulations set out, with a specific risk assessment and a safety observer. Describe the job and the platform writes it.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 11 Work on or near energised electrical installations
- 1 Risk of a fall more than 2 m
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Site arrival, induction and identification of the supply and all sources of energy
- Isolate at the upstream protective device, lock out and tag, with personal locks applied
- Test for dead using a proven tester (prove–test–prove)
- Set up barriers and exclusion zones around nearby energised parts
- Carry out the electrical work on de-energised equipment
- Where live work is justified: specific risk assessment, authorisation, safety observer and insulated equipment
- Test, remove locks and tags, re-energise and hand over
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Electric shock from parts assumed to be dead
De-energise and isolate first; lock out and tag; test before touch; treat as live until proven dead
Arc flash during switching or fault conditions
Work de-energised; where switching or testing near live parts, arc-rated PPE, face shield and insulated tools selected for the hazard
Unexpected re-energising by others
Personal danger tags and locks on every isolation point, isolation register, communication with the site and other trades
Contact with nearby energised parts
Insulating barriers or covers, exclusion zone, safety observer where live parts remain within reach
Who asks for it
Set out the way builders' safety teams expect
Builders, facility managers, data centre operators and network operators ask for it before switchboard, distribution and maintenance work on existing installations.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a energised electrical work SWMS
Is live electrical work ever allowed?
Only in the limited cases set out in the WHS Regulations: where it is necessary in the interests of health and safety (for example, keeping life-saving equipment running), where the equipment must be energised for the work to be done properly, where it is needed for testing, or where there is no reasonable alternative. Convenience is not a reason. A risk assessment, a SWMS, a competent safety observer and the right equipment are required. AS/NZS 4836:2023 sets out safe practices for low-voltage and extra-low voltage work.
Who can do electrical work?
Electrical work must be done by a licensed electrician, or an apprentice under supervision, under the licensing law in your state or territory. The SWMS lists the licences required and you confirm the names when you review it.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Electrical SWMS · Solar Installation SWMS · HVAC / Air Conditioning SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free energised electrical work SWMS arrow_forward