Who regulates it
Workplace Health and Safety Queensland (WHSQ) is the regulator. Its public website is WorkSafe Queensland (worksafe.qld.gov.au), so you will see both names used.
When a SWMS is required in Queensland
A SWMS is required for high risk construction work. WorkSafe Queensland gives examples such as work where a person could fall more than 2 metres, trenches deeper than 1.5 metres, and powered mobile plant operations like crane work. The full list follows the 18 model HRCW categories.
Workers do not each need their own copy, but they must understand the hazards and controls well enough to do the work in line with the SWMS.
Principal contractor duties in Queensland
In Queensland a construction project is one where the cost of the construction work is $250,000 or more, based on the contract price excluding GST. Each project has only one principal contractor at a time. The principal contractor must obtain a SWMS before high risk work starts, prepare a WHS management plan including site rules, and make sure everyone knows it before they start.
Appointments are not notified to WHSQ. Notification goes to QLeave, which also collects the WHS levy on building and construction projects valued at $150,000 or more.
The interactive SWMS tool
WorkSafe Queensland points builders and subbies to the interactive SWMS tool on the Safe Work Australia website. It explains what a SWMS is, how it manages HRCW risk and what the law requires when preparing and using one. It is a learning tool, not a document generator, but it is worth ten minutes if you are new to SWMS. It also covers keeping a SWMS up to date, which the 2018 review of the model WHS laws found was often missed.
Code of Practice
Unlike NSW, Queensland has not approved the model Construction work code of practice. The approved codes most relevant to SWMS work include the Managing the Risk of Falls at Workplaces, Excavation Work, Demolition Work and Scaffolding Codes of Practice 2021. Safe Work Australia's model Construction work code is still useful guidance on SWMS content, consultation and review, but it is not an approved code in Queensland. WHSQ also publishes industry guides with SWMS templates, such as the house relocation industry guide.
What a Queensland SWMS must contain
The content rules are the same as the model laws. A SWMS must:
- checkIdentify the high risk construction work
- checkState the hazards and risks from that work
- checkDescribe the control measures
- checkDescribe how the controls will be implemented, monitored and reviewed
Practical points for Queensland sites
Heat is a real hazard on Queensland sites for much of the year. It is not an HRCW category on its own unless the heat is artificial, but if your SWMS covers roof work or other HRCW in full sun, include hydration, rest breaks and work timing as controls. Inspectors and builders notice when it is missing.
Storm season matters too. If your work is at height or near overhead lines, the SWMS should say when work stops for wind, lightning or heavy rain, and who makes that call.
Keep the SWMS on site or quickly available, and revise it when the work changes. Give the principal contractor the updated copy before you start the changed work.
Common questions
Is a SWMS required in Queensland?
Yes, for high risk construction work under the WHS Regulation 2011 (Qld).
What is the principal contractor threshold in Queensland?
$250,000 or more, based on the contract price excluding GST.
Does WorkSafe Queensland have a SWMS template?
WorkSafe Queensland refers to the Safe Work Australia interactive SWMS tool and includes templates in some industry guides.
Sources
- WorkSafe Queensland — Safe work method statements
- WorkSafe Queensland — Principal contractors
- WorkSafe Queensland — Interactive SWMS tool
- Queensland Legislation — Work Health and Safety (Codes of Practice) Notice 2022 (approved codes)
- Safe Work Australia — Model Code of Practice: Construction work (November 2024)
General information only, current at the date above. Legislation changes — confirm requirements with your state regulator. As the PCBU you remain responsible for your SWMS.