SWMS for Painting
Painting SWMS for heights, lead paint and spray work.
Painting is mostly about access: ladders, EWPs, scaffolds and swing stages on a building that is often still occupied. Add lead paint, silica from sanding old render, and solvents when spraying indoors, and a template SWMS will not cover it. Describe the job and the platform writes it for this building.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 1 Risk of a fall more than 2 m
- 4 Likely disturbance of asbestos
- 12 Contaminated or flammable atmosphere
- 15 Movement of powered mobile plant
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Site arrival, induction and access planning
- Surface preparation — sanding, washing and lead or asbestos checks
- Access set-up — platform ladders, EWP, scaffold or swing stage
- Brush and roller application
- Spray application and ventilation
- Clean-up, waste and solvent storage
- Demobilisation and handover
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Falls from ladders, EWPs and swing stages
Platform ladders only, EWP with harness, inspected scaffold or stage, no overreaching
Lead paint and asbestos in old substrates
Test before sanding; wet methods, containment and P2 respirators; licensed removal where required
Solvent vapours and flammable atmospheres
Ventilation, no ignition sources, respiratory protection, quantities limited to the day’s use
Occupied buildings and the public
Barriers, signage, drop sheets and sequencing with the occupants
Who asks for it
Set out the way builders' safety teams expect
Builders, strata and body corporate managers, councils and commercial clients ask for a painting SWMS before access equipment goes up.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a painting SWMS
Do I need a SWMS for a residential repaint?
If any part of the work is construction work with a risk of a fall more than 2 metres, a SWMS is required. Most exterior work from a ladder, EWP or scaffold qualifies.
Is spray painting covered?
Yes. Spraying is written as its own activity with ventilation, respiratory protection and ignition-source controls, including the flammable atmosphere category where it applies.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Scaffolding SWMS · Roofing SWMS · Carpentry SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free painting SWMS arrow_forward