Pump lines, agitators reversing on site, open edges on suspended slabs, silica from cutting and grinding, tilt-up and precast panels — concreting carries several high-risk categories at once. The SWMS has to cover the pour sequence and the plant around it. Describe the job and the platform writes it.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 15 Movement of powered mobile plant
- 1 Risk of a fall more than 2 m
- 13 Tilt-up or precast concrete
- 7 Trench or shaft deeper than 1.5 m, or a tunnel
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Site arrival, induction and traffic management for agitators and pumps
- Formwork and reinforcement check, pre-pour inspection
- Pump set-up, line securing and exclusion zones
- Placing, screeding and finishing the pour
- Cutting, grinding and coring (wet methods, extraction)
- Tilt-up or precast panel lifting and propping
- Curing, stripping and clean-up
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Mobile plant — agitators, pumps and line pumps reversing
Spotter and exclusion zone, traffic management plan, no one between the truck and the pump hopper
Pump line whip and blockages
Lines secured, blockage procedure, exclusion around the hose end, hose-hand only at the discharge
Falls from suspended slabs and formwork edges
Edge protection and penetration covers before the pour; no work outside the protected area
Concrete burns and silica dust
Gloves and eye protection for wet concrete, wet cutting and P2 respirators for cutting and grinding
Who asks for it
Set out the way builders' safety teams expect
Builders, civil contractors and precast suppliers ask for it before the first pour, and principal contractors expect the pump and plant interaction to be in it.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a concreting SWMS
Does it include tilt-up and precast?
If the job involves tilt-up or precast panels the SWMS covers the lift, bracing and propping sequence as HRCW category 13, with the engineer’s detail referenced.
What about the concrete pump operator?
The pump operator usually works to their own SWMS as well. Yours covers the interaction — exclusion zones, line securing, communication and the blockage procedure.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Carpentry SWMS · Excavation SWMS · Civil Works SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free concreting SWMS arrow_forward