Simple, honest pricing.
No subscriptions, no lock-in. Your first SWMS is free; every one after that is a flat fee.
FREE
Your first SWMS
Every new account builds its first SWMS at no charge. No credit card required.
- check_circleSite-specific SWMS built on the platform in minutes
- check_circleControls drawn from a consultant-reviewed control library
- check_circleLegislation and Codes matched to your state or territory
- check_circle25+ quality checks before issue
- check_circleEmailed to you as a Word document to review and amend
- check_circleUp to 3 revisions per SWMS
$19.99 inc. GST
Every SWMS after that
Flat fee, paid before the SWMS is generated. No hidden extras. ($18.17 ex GST)
- check_circleSite-specific SWMS built on the platform in minutes
- check_circleControls drawn from a consultant-reviewed control library
- check_circleLegislation and Codes matched to your state or territory
- check_circle25+ quality checks before issue
- check_circleEmailed to you as a Word document to review and amend
- check_circleUp to 3 revisions per SWMS
AUD. Tax invoice emailed by Stripe. Secure card payment. In the phone app the price is shown in the store.
What the alternatives cost
Downloaded template
Your evening
Free to a few hundred dollars, then hours rewriting it — and it still isn't specific to your site, scope or high-risk work.
Consultant-written
Several hundred dollars*
Site-specific and thorough, but typically several business days — not much help when the builder wants it tomorrow.
Site Specific SWMS
$19.99 inc. GST
Written for your job in about five minutes, from the same control library and checks a consultant uses. First one free. Three revisions.
* Indicative market ranges for an individual consultant-prepared SWMS in Australia; they vary by trade, scope and consultant. A consultant is still the right choice for complex, multi-stage or engineered works — iHSEQ does that work too.
What's in every SWMS
- checkSite-specific hazard identification
- checkRisk assessment for your HRCW categories
- checkSite-specific control measures in hierarchy order
- checkRelevant legislation references
- checkAlignment with the Code of Practice for construction work
- checkWorker consultation and sign-on section
- checkPlant, equipment, permits and licences
- checkEmergency procedures and nearest hospital
- checkUp to 3 revisions per SWMS