SWMS for Roofing
Roofing SWMS for re-roofs, new roofs and roof repairs.
Every roofing job is work at height, and many add brittle sheeting, asbestos in old roofs, hot works for membranes and crane lifts of materials. The builder, the strata manager or the facility manager will want to see how you stop a fall before anyone goes up. Describe the job and the platform writes it.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 1 Risk of a fall more than 2 m
- 4 Likely disturbance of asbestos
- 15 Movement of powered mobile plant
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Site arrival, induction and roof access planning
- Edge protection, guardrails or harness anchor set-up
- Material delivery and crane or hoist lifts
- Removal of old sheeting (asbestos check first)
- Installing battens, sarking and new sheeting
- Flashings, gutters, skylights and penetrations
- Clean-up, removal of edge protection and handover
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Falls from the roof edge, through skylights or brittle sheeting
Perimeter guardrails or scaffold, skylight covers and walkways, harness as the last resort with a rescue plan
Asbestos in old roofing and gutters
Check the register and sample before removal; licensed removal if asbestos is present
Crane and hoist lifts of materials
Lift plan, exclusion zone, dogman and tagline, no one under the load
Heat stress and weather
Start times, shade and water, stop-work triggers for wind and rain
Who asks for it
Set out the way builders' safety teams expect
Builders, strata managers, insurers and commercial facility managers all expect a roofing SWMS with the fall-prevention method spelled out for this roof.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a roofing SWMS
Can I use a harness instead of edge protection?
Edge protection, scaffold or platforms come first in the hierarchy. A harness system is the last option and the SWMS will include an anchor check and a rescue plan if it is used.
Is removal of an asbestos roof covered?
The SWMS covers identification and stop-work. Removal of more than 10 m² of non-friable asbestos needs a licensed removalist, and the SWMS says so.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: Carpentry SWMS · Plumbing SWMS · Scaffolding SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free roofing SWMS arrow_forward