SWMS requirements in Western Australia

Western Australia moved to the harmonised WHS model with the Work Health and Safety Act 2020 (WA). For construction, the detail sits in the Work Health and Safety (General) Regulations 2022. If you do high risk construction work in WA, you need a SWMS before you start.

By iHSEQ Pty Ltd, WHS and ISO consultants · Updated 31 October 2026

The law in WA

The WHS Act 2020 (WA) and its regulations replaced the old Occupational Safety and Health Act 1984 framework. There are separate regulations for general workplaces and for mines: the WHS (General) Regulations 2022 and the WHS (Mines) Regulations 2022. Most building work falls under the General Regulations.

The regulator is WorkSafe WA, part of the Department of Energy, Mines, Industry Regulation and Safety.

When a SWMS is required in WA

WorkSafe WA states the regulations require a SWMS to be prepared for high risk construction work before the work starts. WA uses the 18 model HRCW categories, including falls of more than 2 metres, trenches deeper than 1.5 metres and work near energised electrical services.

A SWMS is not required for work of a minor nature. WorkSafe WA points to Safe Work Australia guidance on what counts as minor work. If in doubt, prepare one.

What it must contain

As with the other harmonised states, a WA SWMS must:

  • checkIdentify the high risk construction work
  • checkSet out the hazards and risks from that work
  • checkDescribe the control measures
  • checkDescribe how the controls will be implemented, monitored and reviewed

Construction at mine sites

Construction work at a WA mine site falls under the WHS (Mines) Regulations 2022. WorkSafe WA says the SWMS requirements can be met through one or more documents forming part of the mine safe system of work, as long as the required content is there and workers can access and understand it. Check the mine operator's requirements before you mobilise.

WorkSafe WA resources

WorkSafe WA publishes an information sheet on SWMS for high risk construction work and a downloadable SWMS template. Use them as a reference point. Like any template, it must be completed for the actual site and work.

Consultation, review and keeping

The SWMS must be prepared in consultation with the workers who will do the work. Review it whenever control measures change, and stop the work if it is not being done in line with the SWMS. Do not restart until it can be.

Keep the SWMS on site, or where it can be delivered quickly, until the HRCW is finished. Electronic copies are fine. If it is revised, keep every version, and if there is a notifiable incident, keep it for at least 2 years.

Practical points for WA sites

Many WA subbies moved over from the old OSH framework still using JSAs for high risk work. Under the WHS laws, HRCW needs a SWMS with the required content. Update older templates that refer to the Occupational Safety and Health Regulations 1996, and make sure each SWMS has the actual site address, the crew and the controls you will use on that job.

Remote and regional work adds its own controls. If the site is hours from a hospital, the emergency section should cover first aid capability, communication where there is no mobile coverage, and how an injured worker will be evacuated.

Common questions

Is a SWMS required in WA?

Yes, for high risk construction work under the WHS (General) Regulations 2022.

Does WA still use the OSH Act?

No. WA now uses the Work Health and Safety Act 2020 and its regulations for most workplaces.

Does WorkSafe WA have a SWMS template?

Yes. WorkSafe WA publishes a SWMS template and information sheet for high risk construction work.

Sources

General information only, current at the date above. Legislation changes — confirm requirements with your state regulator. As the PCBU you remain responsible for your SWMS.

See a finished SWMS first

A complete 14-page example as a Word document, emailed to you.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy