SWMS for Working at heights

Working at heights SWMS that shows how a fall is prevented.

Any construction work with a risk of a fall of more than 2 metres is high-risk construction work and needs a SWMS before it starts. The SWMS has to follow the hierarchy: work from the ground where you can, then edge protection or scaffold, then EWPs, then restraint, with fall arrest last. Describe the job and the platform writes it for this site.

  • First SWMS free, no card
  • Word document in about 5 minutes
  • $19.99 inc. GST after that, 3 revisions included

High-risk construction work this SWMS usually covers

  • 1 Risk of a fall more than 2 m
  • 15 Movement of powered mobile plant

Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.

What goes in it

Typical activities, in the order you do the work

  1. Site arrival, induction and a check of the access route and the work area
  2. Plan the work to reduce time at height — prefabricate or assemble at ground level
  3. Install edge protection, guardrails or scaffold, or cover voids and penetrations
  4. Set up and inspect the EWP, including ground conditions and overhead powerlines
  5. Fit and inspect travel restraint or fall-arrest equipment where no physical barrier is practicable
  6. Carry out the task, with tools tethered and an exclusion zone below
  7. Remove access equipment and edge protection in reverse order, then clean up

Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.

Key hazards and how they are controlled

Written as controls, not slogans

Falls from open edges, roofs and through voids

Work from the ground or prefabricate first; then guardrails, scaffold or void covers installed before anyone is exposed; EWP where barriers are not practicable

Falls from ladders

Industrial-rated platform ladders for most tasks; single and extension ladders only for access or short, light work, set at 4:1, secured and three points of contact kept

Suspension trauma and failed harness systems

Travel restraint before fall arrest; anchors rated and inspected; harness users trained; written rescue plan with equipment on site before work starts

Falling objects striking people below

Toe boards and mesh on edges, tool lanyards, exclusion zone or overhead protection below, no materials stored near edges

Who asks for it

Set out the way builders' safety teams expect

Builders and principal contractors ask for it before anyone goes up; strata, facility managers and insurers ask for it for roof, facade and gutter work on existing buildings.

  • verifiedSite address, PCBU, supervisor and contact details on the front page
  • verifiedHRCW checklist ticked for the work actually being done
  • verifiedYour state's WHS legislation and Codes of Practice referenced
  • verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
  • verifiedConsultation and sign-on sheet for the crew

See the output first

Email me a sample SWMS

A full 14-page example as a Word document, so you can see exactly what you'll get before you start.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy

Questions about a working at heights SWMS

When do I need a SWMS for working at heights?

A SWMS is required for construction work that involves a risk of a person falling more than 2 metres. Falls from lower heights still have to be managed under the WHS Regulations, and some states have extra rules — for example for housing construction in Queensland.

Is a harness enough on its own?

No. Fall arrest is the last option in the hierarchy. The SWMS shows why higher controls are not practicable, names the anchor points, and includes a rescue plan, because a person left hanging in a harness needs to be rescued quickly.

How much does it cost?

Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.

Related: Scaffolding SWMS · Roofing SWMS · Mobile plant SWMS

Builder asked for a SWMS by tomorrow?

Describe the job tonight and it's in your inbox in minutes. First one free.

Start my free working at heights SWMS arrow_forward