SWMS for Electrical
Electrical SWMS, written for the job in front of you.
Switchboard upgrades, new circuits, fit-outs, solar, data — if the work is on or near energised electrical installations it is high-risk construction work and the builder will ask for a SWMS before you start. Describe the job and the platform writes it: isolation and test-for-dead sequence, working in ceiling spaces, penetrations and silica, testing and commissioning.
- First SWMS free, no card
- Word document in about 5 minutes
- $19.99 inc. GST after that, 3 revisions included
High-risk construction work this SWMS usually covers
- 11 Work on or near energised electrical installations
- 1 Risk of a fall more than 2 m
- 4 Likely disturbance of asbestos
- 15 Movement of powered mobile plant
Categories per the model WHS Regulations, s 291 (OHS Regulations 2017, r 322 in Victoria). You confirm which apply when you describe the job.
What goes in it
Typical activities, in the order you do the work
- Site arrival, induction, permits and work-area set-up
- Identify the supply, isolate at the upstream protective device, lock and tag, test for dead (prove–test–prove)
- Cable installation in ceiling spaces, risers and penetrations
- Switchboard or distribution board work
- Core drilling and penetrations (wet methods, P2 respirator)
- Testing, commissioning and re-energising
- Demobilise, remove isolation, clean up and handover
Each activity gets its hazards, the controls in hierarchy order (eliminate, substitute, isolate, engineering, administrative, PPE), the residual risk rating and who is responsible.
Key hazards and how they are controlled
Written as controls, not slogans
Electric shock and arc flash
Isolation, lock-out, test for dead; no live work; insulated tools, arc-rated PPE and exclusion of non-electrical workers
Falls from ladders, EWPs and in ceiling spaces
Platform ladders, edge protection or EWP with harness, three points of contact, no work from the top rungs
Asbestos in older switchboards and backing panels
Pre-start check of the asbestos register; stop and refer to a licensed removalist if suspected
Respirable crystalline silica from drilling and chasing
Wet cutting or on-tool extraction, P2 respirator, exclusion of others from the dust zone
Who asks for it
Set out the way builders' safety teams expect
Builders, electrical contractors subcontracting to a principal contractor, strata and facility managers, and solar installers all ask for one — and it must be site-specific, not a template with the address changed.
- verifiedSite address, PCBU, supervisor and contact details on the front page
- verifiedHRCW checklist ticked for the work actually being done
- verifiedYour state's WHS legislation and Codes of Practice referenced
- verified5×5 risk matrix, hierarchy of controls, emergency response and nearest hospital
- verifiedConsultation and sign-on sheet for the crew
See the output first
Email me a sample SWMS
A full 14-page example as a Word document, so you can see exactly what you'll get before you start.
Questions about a electrical SWMS
Do I need a SWMS for every electrical job?
A SWMS is mandatory for high-risk construction work. Work on or near energised electrical installations or services is HRCW (category 11), and so is any work with a risk of a fall more than 2 metres. Most construction electrical work falls into at least one category.
Does it cover isolation and test for dead?
Yes. The isolation sequence — identify, isolate, lock and tag, test for dead, re-test — is written as its own activity with the responsible person named, and the SWMS states that live work is not permitted.
How much does it cost?
Your first SWMS is free. Every SWMS after that is $19.99 inc. GST, paid before it is generated, with up to 3 revisions included. No subscription.
Related: HVAC / Air Conditioning SWMS · Plumbing SWMS · Carpentry SWMS
Builder asked for a SWMS by tomorrow?
Describe the job tonight and it's in your inbox in minutes. First one free.
Start my free electrical SWMS arrow_forward