Step 1: Identify the high risk construction work
Start with the list of 18 HRCW categories and tick every one that applies to this job. A roof plumber on a two-storey house is usually ticking falls over 2 metres, and possibly powered mobile plant and asbestos on older homes. The ticked categories decide what the SWMS has to cover.
Step 2: Break the job into steps
List the work in the order it happens: arrive and set up, access, the main tasks, testing, pack up. Each step gets its own hazards and controls. This sequence is what makes a SWMS readable on site.
Step 3: Hazards and controls, in the right order
For each step, write the hazards from the high risk work and the controls. Work down the hierarchy of control: eliminate the hazard first, then substitute, isolate or use engineering controls, then administrative controls, and PPE last.
Be specific. "Use edge protection" is weak. "Scaffold with handrail, midrail and toeboard on all open edges, tagged by a licensed scaffolder before use" is what an inspector wants to see.
- checkName the isolation method for electrical, gas, mechanical or pressurised services
- checkState permits needed (hot work, confined space, excavation, dig permits)
- checkList licences and tickets (high risk work licence, asbestos, white card)
- checkInclude emergency and rescue arrangements, especially for falls and confined spaces
- checkSay who is responsible for each control
Step 4: Consult, sign on and review
Go through the SWMS with the crew before work starts and let them change it. Record who was consulted and get each worker to sign on. Set a review point and review it whenever the method, the site or the controls change.
Common mistakes builders reject
These are the reasons we see SWMS bounced back by principal contractors most often:
- checkGeneric template with no site address, or the wrong address
- checkControls that are only PPE, or "be careful" and "take care"
- checkHRCW boxes ticked that do not match the work described
- checkNo isolation sequence for electrical or services work
- checkNo emergency or rescue plan for work at height or confined spaces
- checkNo sign-on, consultation record or review date
- checkThirty pages of risk matrices and no clear sequence of work
How the generator does it
You describe the job, the site address and the crew. You can upload your quote or site photos and the platform reads them. It ticks the HRCW categories, builds the steps in order, and draws controls from a reviewed control library in hierarchy order. It applies the legislation for your state and runs 25+ checks for gaps like missing isolation or emergency arrangements, then gives you an editable Word document.
You still have to read it, change anything that does not match how you work, take the crew through it and sign it off. That review is your legal duty and it cannot be outsourced to software.
Common questions
Can I write my own SWMS?
Yes. The PCBU doing the work is responsible for it. You do not need a consultant, but it must be site-specific and prepared in consultation with your workers.
How long should a SWMS be?
As short as it can be while covering the high risk work. Regulators say plain language and a clear sequence matter more than length.
Can I use a SWMS template?
A template can be a starting point, but it must be reviewed and changed for the actual site and work before it is used.
Does every worker need to sign the SWMS?
The law requires workers to be consulted and to understand the SWMS. Signing on is the usual way to show that, and most builders require it.
Sources
- Safe Work Australia — SWMS information sheet and template
- SafeWork SA — Safe work method statements
- WorkSafe Victoria — Safe Work Method Statements (SWMS)
- WorkSafe ACT — Safe Work Method Statements
General information only, current at the date above. Legislation changes — confirm requirements with your state regulator. As the PCBU you remain responsible for your SWMS.
See a finished SWMS first
A complete 14-page example as a Word document, emailed to you.