SWMS for scaffolding work

Scaffolds are one of the safest ways to work at height when they are designed, built and used properly, and one of the most dangerous when they are not. Falls from incomplete scaffolds, collapses from overloading or removed ties, and objects dropped onto people below all show up in regulator incident reports. Safe Work Australia says scaffolding work with a fall risk of more than 2 metres is high risk construction work, so a SWMS is needed before work starts.

By iHSEQ Pty Ltd, WHS and ISO consultants · Updated 31 October 2026

Two different SWMS: erecting the scaffold and working from it

There are really two jobs here, and they are usually done by different businesses. The scaffolding contractor erects, alters and dismantles the scaffold. Other trades, such as bricklayers, renderers, painters and roofers, then work from it. Each PCBU doing high risk construction work needs a SWMS for its own work.

The scaffolder's SWMS covers the erection sequence, fall protection while building (when edge protection is not yet in place), loading out and lifting gear, ties and bracing, and handover. The SWMS for a trade working from the scaffold covers safe access, keeping within the duty rating, not altering the scaffold, materials storage on the deck and falling object controls. A trade SWMS that just says "scaffold provided by others" does not deal with how that trade will use it.

Licences: the 4 metre rule

A high risk work licence is required to erect, alter or dismantle a scaffold where a person or object could fall more than 4 metres from the platform or the structure. There are three classes:

  • checkBasic (SB): modular and prefabricated scaffolds, ropes and gin wheels, safety nets and static lines, bracket scaffolds for tanks and formwork, and cantilevered materials hoists up to 500 kg working load
  • checkIntermediate (SI): everything in basic, plus tube and coupler scaffolds, cantilevered and spurred scaffolds, cantilevered crane loading platforms, barrow ramps, perimeter safety screens and mast climbers
  • checkAdvanced (SA): everything in intermediate, plus hung scaffolds, suspended scaffolds and cantilevered hoists

Below 4 metres

Under 4 metres no scaffolding licence is needed, but the scaffold still has to be erected by someone competent, to the manufacturer's instructions, and still has to be inspected before use. Mobile aluminium towers and low modular scaffolds on house sites are where shortcuts are common: missing guardrails, castors left unlocked and platforms built higher than the base allows. Remember that a fall of more than 2 metres from a low scaffold is still high risk construction work.

Handover and inspection

For a scaffold from which a person or thing could fall more than 4 metres, the model WHS Regulations (r 225) say it must not be used until a competent person has given written confirmation that it is complete. This is usually a handover certificate, kept on site until the scaffold is dismantled. A new certificate is needed after alterations, repairs or additions.

A competent person must then inspect the scaffold and its supporting structure before use after an incident that may affect its stability, before use after repairs, and at least every 30 days. If an inspection finds a risk, it must be repaired and re-inspected before use. Incomplete or unattended scaffolds must be protected against unauthorised access. Most sites back this up with a scaffold tag at each access point showing the inspection date and duty rating. Tags are good practice and a common site rule, not a substitute for the handover certificate.

Controls a builder expects to see

Write the controls for this scaffold on this site. Inspectors and principal contractors look for:

  • checkScaffold type, duty rating and the licence class of the erector named
  • checkGround checked: sole boards or base plates on firm ground, clear of trenches, pits, soft fill and recently backfilled excavations
  • checkTies, bracing and anchors installed as designed, and no removal by other trades (only the scaffolder alters the scaffold)
  • checkGuardrail, midrail and toeboard on every open edge, plus mesh or brick guards where materials are stacked
  • checkGap between the deck and the building kept to the design, with inside boards or extra guardrails where it is too wide
  • checkSafe access by stair or internal ladder, not by climbing the frame
  • checkLoads kept within the duty rating; no stockpiling of bricks, tiles or sheet materials beyond what the scaffold is designed for
  • checkExclusion zone or covered walkway below, with no work on the deck while people pass underneath unprotected
  • checkWind and weather limits, especially for scaffolds with shade cloth or containment sheeting
  • checkErection sequence with edge protection or harness system used while building, following the manufacturer and the Code

Powerlines and public areas

Scaffolds near overhead powerlines need a planned approach distance. Approach distances are set by state and territory electrical safety laws and depend on voltage, so check your electricity regulator or network operator and write the actual distance into the SWMS. Where the scaffold cannot be erected outside the no-go zone, contact the network operator about tiger tails, de-energising or a permit before work starts.

Scaffolds over footpaths or roads usually need council approval and may need a gantry or hoarding, plus traffic or pedestrian management. Work next to a road in use by traffic is a separate high risk construction work category, so tick it if it applies.

State notes

Queensland has an approved Scaffolding Code of Practice 2021. WorkSafe Queensland also notes that during erection and dismantling, a control measure is needed where there is a fall risk above 3 metres on housing work or 2 metres on other construction work. Victoria uses its own OHS Act 2004 and OHS Regulations 2017, so check WorkSafe Victoria for the detail, although high risk work licence classes are recognised nationally. In every jurisdiction, a scaffold collapse or a falling scaffold component can be a notifiable dangerous incident, so the SWMS should say who reports it and that the scene is preserved.

Common questions

Do I need a SWMS to work on a scaffold?

If the work involves a risk of falling more than 2 metres, it is high risk construction work and needs a SWMS, even when the scaffold is fully edge protected. The SWMS covers how your trade uses the scaffold.

At what height do you need a scaffolding licence?

A licence is needed to erect, alter or dismantle a scaffold where a person or object could fall more than 4 metres. Basic, intermediate and advanced classes cover different scaffold types.

How often must a scaffold be inspected?

For scaffolds with a fall risk of more than 4 metres: before first use, after an incident that may affect stability, after repairs, and at least every 30 days, by a competent person.

Can I move a scaffold tie or remove a guardrail to get my work done?

No. Only the scaffolder should alter the scaffold. Ask the principal contractor to arrange the change, and do not use the scaffold until it has been re-inspected and handed over again.

Sources

General information only, current at the date above. Legislation changes — confirm requirements with your state regulator. As the PCBU you remain responsible for your SWMS.

See a finished SWMS first

A complete 14-page example as a Word document, emailed to you.

We'll email the sample once and may follow up to see if you need a hand. No spam, unsubscribe any time. Privacy